Skip to content
Snippets Groups Projects
Commit 10370cd3 authored by Guillaume Samson's avatar Guillaume Samson :snowman2:
Browse files

Merge branch '4-update-sbc-doc-related-to-fldread-changes-see-21-in-nemo-project' into 'main'

Resolve "update SBC doc related to fldread changes (see #21 in Nemo project)"

Closes #4

See merge request !12
parents e6cadf51 e2527cd5
No related branches found
No related tags found
1 merge request!12Resolve "update SBC doc related to fldread changes (see #21 in Nemo project)"
Pipeline #1531 passed with stage
in 7 minutes and 19 seconds
......@@ -257,6 +257,9 @@ where
Records are assumed to be dated at the middle of the forcing period.
For example, when using a daily forcing with time interpolation,
linear interpolation will be performed between mid-day of two consecutive days.
If you want to change this behaviour, it is possible to prepend the variable name with a '-' or a '+' sign.
In the first case, the records will be dated at the beginning of the forcing period,
while in the second case, the records will be dated at the end of the forcing period.
\item [Climatological forcing]: a logical to specify if a input file contains climatological forcing which can be cycle in time,
or an interannual forcing which will requires additional files if
the period covered by the simulation exceeds the one of the file.
......
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment